Dooly’s in Oromocto is relocating and Wired 1 Consulting is handling the transfer of the equipment and the low voltage wiring for the new location in the Oromocto Mall. No air conditioning today! Extremely damp!!
This was the scene today getting all the speaker wires and feeds for the flat panel televisions in place. Next step will be dismantling the old location and moving all the electronics – thank God we don’t have to move the pool tables!